Goal:
To build a balsa wood bridge that will support the largest possible
load. The bridges will be loaded to the point of failure during an
organized contest.
Materials:
The following materials will be provided by the instructor.
You will also be given some material samples for testing purposes. These samples may not be used in the final structure.
Constraints:
Each bridge must connect two sides of an 18 in span across two classroom
tables. The loading plate must fit in the center of the bridge in
such a way that the mass holder can be attached to the metal hook.
The loading plate may not be permanently attached to or used as part of
the structure of the bridge. The transparent tape may only be used
to attach the two ends of the bridge to the tables, not to reinforce the
structure.
Report:
Each team will prepare a two-page written report describing their efforts.
Diagrams and sketches may be attached to the report.
Resources:
You may use any general references you wish. However, the bridge
design and construction must be your own.
Loading Contest Guidelines:
Each team will receive a 1-kg mass holder that they must attach to
the loading plate on their bridge. Thereafter, each team will increase
the load in 1 kg or 0.5 kg increments. The bridge must support the
load in static equilibrium in order to receive credit for it. The
builders of the last remaining bridge will decide whether or not to load
their bridge to the point of failure.
The names of the loading contest winners and the maximum supported load
will be added to the plaque in the hallway display.